Demolition of the Camp

The camp ceased operations after the summer of 1993.  In 1995, the city demolished many of the camp buildings and features.

The pools were excavated and removed  rather than filled in.

The following buildings were demolished:

Kitchen, Outdoor Patio, Nurse’s Building, Locker Room, all pool buildings, all cabin buildings – except one in each unit area, Garages, Jr. & Sr. A&C, Pottery, Photography, Nature.

The following features were demolished:

All treehouses, all playground equipment (except one swing set in the Muppet area) Mini-Golf. the Tennis and Basketball Courts, Outdoor Stage, Baseball Fence.

Remaining Buildings & Features:

Both A-Frames, commando course, paddleball wall, 3 cabin buildings

GOLF ipool LOCKER LOCKER2 MUPPET kitchen

JETSONS