Auditorium Complex

In 1962, the need for a large indoor shelter became apparent. In addition, Bert was considering an expansion of the Swim Club including a new pool and separate locker and dining facilities. In order to develop a plan, he turned to his friend, architect Mandel Sprachman.

From conception, the design was modular to allow for expansion. It included several buildings linked together by hallways. The ultimate use of each building changed over time as the separate Swim Club plans were abandoned.

Design Objectives:

FV Challenge

FV Challenge - Auditorium Profiles 2Project1FV Challenge - Auditorium Site Layout w pool

Preliminary Sketches

As seen in the sketch below, the intention was to add a new pool in the Treehouse Field location. The eventual Main Office building was not included in the original construction. It is shown in the sketch below as a, “future locker room”.  The placement of the Terrace in this sketch is different than the final design which saw it located further ahead of the Auditorium with a different hallway placement.

complex concept W POOL

This survey shows the final placement of the buildings relative to one another:

Complex

Bert’s notes documenting the requirements for the complex:

REQUIREMENTS1

Auditorium - planning2

OFFICE WING

This is not the main office. It was built later. This is the part with the fireplace. The first concept did not include a fireplace:

rev-Office Wing

The fireplace was a last-minute addition to the building in 1964 because the ski club was starting up. It was envisioned as a popular spot in the winter time – and likely was. The ski club only lasted for a few years turning this spot into a curiosity.

The updated design including the fireplace:

Office Wing Final

The original design for the fireplace:

Fireplace design

Fireplace after completion:

pic_2014-11-22_105051

TERRACE

The final design of the Terrace along with the layout for the kitchen:

Oasis Plan June 1964 Auditorium Kitchen Layout

Construction Estimate – November 1964:

Construction Estimate from Contractor - 1963

Construction Estimate – August 1964

Building Cost - 1964

Construction Estimate – November 1964:

Progress Certificate - November 1964

Construction Estimate – December 1964:

Progress Certificate - December1964

 

Auditorium Roof Blueprints:


Auditorium Roof Framing Plan Feb 1964

Auditorium Plan 1 - Feb 1964

Auditorium Floor Layout:

Auditorium - Floor Marking

Paint Colours for Complex:

Auditorium Colors


Paint Quote - 1964

Miscellaneous Invoices:

Lighting:

  Lighting Quote - 1964

Hardware:

Aikenhead's Quote - 1964-4

Benches for fireplace:

Auditorium Benches

Hardware:

Aikenhead's Quote - 1964

Hardware:

Aikenhead's Quote - 1964-2

Submission to Canadian Architect Magazine:

Construction Letter Feb 1965

Building the Office Addition

Blueprints

Main Floor:

Main Office Addition - 1971

Basement:

Office Basement Plan

A Proposal for a Locker Room with Sauna and second floor storage. This was to be located behind the Auditorium:

Proposed 3rd floor Addition as Locker Room above Office Location

Letters from Bert:

pic_2014-11-22_103541 Letter From Bert re Auditorim - signed letterhead - March 1964

CONSTRUCTION & USE

With increasing enrolment and a need for more indoor facilities, plans for the auditorium began in 1963. Prominent Toronto architect Mandel Sprachman designed the auditorium and adjacent buildings, receiving an award for his design.  The project was featured in The Canadian Architect magazine in March, 1965. Among his many projects, Sprachman also restored the city’s legendary Elgin-Winter Garden vaudeville house to its original splendour.

The auditorium was used for numerous purposes in the early years. The swim club held dances and bridge tournaments. Several weddings were also held there. The ski club had Friday night dances leading Bert to star a short-lived Friday night dance club for teenagers. David Clayton Thomas was one of the first performers. Adjacent to the Auditorium was the Terrace, which included washrooms and a full kitchen.  It was later used as a snack bar for the ski and swim clubs and was occasionally used for camp activities.  More about the Terrace HERE. The complex also included a fireplace and office building.

Construction of the Auditorium began in the fall of 1964 and the building was ready for use the following summer.

The black & white photos in this post were scanned from an uncut roll of 35mm film negatives.  It is unlikely that they were ever printed before.

View down the hill at the start of construction in 1964: IMG_0057 The first Auditorium beams being placed. Looking east, with Terrace in background: IMG_0053 IMG_0065 View from future location of Sugar Shack. Terrace on the left: IMG_0060 View from parking lot. Terrace in background. Cedar shingles for Auditorium roof in foreground:

IMG_0069

  View from the bottom of the parking lot: IMG_0066 Bert in front of the auditorium during construction. 1964: Shingle application.  1964 shingles

Terrace Construction

The Terrace building was the first to be built.  The following 2 photos taken from future location of Auditorium doors. The window on the right would later be replaced with a door:

IMG_0040IMG_0046

Photo taken from behind future Auditorium. Looking N/E:

IMG_0048

Photo taken from Treehouse Field:

IMG_0067

Office Building – taken from parking lot.  This is the office used by the supervisors and also contains the fireplace. The door at right would later attach to the main office via a glassed corridor. The main office building was not built at this time.  It was added several years later.

IMG_0049

After completion:

Aerial View of Auditorium - 1964

The “Fireplace”:

fireplace

Interior Views:

  80s, auditorium

 

The design of the auditorium complex as featured in the March 1965 issue of The Canadian Architect.

 

07 The Canadian architect - March 1965


 

Page 1


 

Page 2


 

 

Page 3


 

 

 

 

Page 4

Completion Photo:

1964-Air View New Bldg2

1964-Air View New Bldg2